|
Dear Exhibitors and stand contractors!
Please pay your attention to the basic
positions of the Exhibitor's Manual, that deal with your participation at
MAKS-2011.
1. The full list of services you will be able to find at the
section “List
of services”. Please note that all mentioned
services within the territory of MAKS-2011 shall be rendered only by JSC
Aviasalon or by companies accreditated in the Directorate. In case of ordering
necessary services you need to fill in Forms: Technical forms ( ~ 2.2 Mb), Advertising Forms, etc.
2. Access to the territory. Access to the
territory of the Exhibition during mounting, working hours and demounting of
the Exhibition shall be provided by passes in compliance with the time period
stated therein, with the document of identification.
3. Entry/removal procedure. The entry to the
Exhibition territory
of lorries
and passenger transport intended for loading/ unloading shall be subject to
payment and having a pass. The maximum stay time of a vehicle within the
Exhibition territory shall be 4 hours.For the purposes of ordering and
obtaining a single pass, you should refer to the official forwarding agent of
the Exhibition – “EXPO-M”,LLC.
4. Loading and unloading
operations. Forwarding
services, customs clearance of exhibition goods and stand equipment is
performed by the official forwarding agents of the Show EXPO-M, LLC and EXPOWESTRANS,
ZAO. Loading/unloading operations with mechanized aids shall be performed
only by specialists and aids of EXPO-M, LLC and EXPOWESTRANS, ZAO, official
forwarding agents of the Exhibition. Use of mechanized aides (including motor
vehicles equipped with load lifting manipulators) and personnel of other
organizations shall not be allowed.
|
EXPO-M, LLC
Tel. : +7(495) 933 48 30 / 31 / 32
Eugene Brunin ext. 303, jekku@expo-m.ru
GeorgyZakharov, geo@expo-m.ru
Issuance of pass tickets for motor transport
Elena Ruleva ext. 413, ruleva@expo-m.ru
|
EXPOWESTRANS, ZAO
Tel.:
+7 (495) 605-66-50
Polina Solov’jova, tel.: +7 (495) 605 03
27, exhib@ewt.ru
Sergey Mints, tel.: +7 (499) 256 74 72, customs@ewt.ru
Vladimir Azarov, tel.: +7 (499) 256 72 38,
ewt4@ewt.ru
|
5. Construction of stands. All
works on Exhibition stand construction, decoration and supplementing with
additional Exhibition equipment shall be performed by the Exhibition General
Developer – EXPOLINK COMPANY, LLC.Invitation of outside developers to perform
mounting-demounting and decoration works shall be permitted only for
construction of irregular Exhibition stands and with coordinated design
documents available (see Section “Coordination Procedure of Design
Documentation”).
If you delegate performing of
construction, electrical installation and decoration works to the external
company, make sure to bring the new “list of the
documents necessary for coordination of technical documentation” (Participant's manual (~ 430 kb) to
its notice.
The list of the documents necessary for coordination of technical documentation:
· Original of
the certificate on compliance to international standards of the GOST R ISO 9000
series (the original to be returned) or notarially certified copy of the
specified documents;
· Letter of
authorization for stand (chalet) construction on a headed paper issued by the
participant in the Exhibition;
· Letter with
the name of the company for which Exhibition stand is constructed with the list
of equipment and materials to be imported and exported;
· Project of
the stand including drawings and views in isometric perspective;
· Detailed
plan of the stand specifying all the dimensions with description of all types
of construction materials;
· All
electrical connections of the stand specifying power voltage, maximum load
power for each unit of equipment, points of connection of electrical equipment
with comprehensive description of conventional designations and specification
of total power on the stand;
· Certificates
of compliance for all the materials and structures used for stand construction
including electrical engineering, acts of flame-retardant treatment of
flammable materials used for stand construction;
· License for
the right to design a two-stage stand with the positional plan of the structure
element enclosed;
· Drawings
for construction of a two-stage stand specifying all the dimensions in scale
1:100 with sectional views signed by the engineer with the stamp of the
organization developed the project of the stand;
· List of
electrical engineering personnel (on the headed paper of organization) involved
in electric wiring of the stand signed by the director of the developer;
· Copy of the
register of electrical engineering personnel knowledge assessment;
· Copy of
orders on appointment of the person responsible for electrical works and
occupational safety;
· Photocopies
of certificates of electrical engineering personnel specified in the list (not
lower than the third class of electrical safety), including qualification
credit;
· Constructors
and architects professional liability insurance policy;
· Permission
of the special fire department No. 45
Documents on formalization and coordination of
construction:
Form 1 - Contract
(~ 120 kb)
Form 1A - Act
of compliance to the technical documentation
(~ 43 kb)
Form 1B - Letter
for two-level stand construction
(~ 27 kb)
Form 1C - Letter
of guarantee (for outside stands)
(~ 23 kb)
Manager for cooperation with foreign stand builders
Evgenia Korochenskaya, tel.: +7 (495) 989-26-63. E-mail: evgenia@expo-link.ru.
Please pay attention
to the Fire fighting and safety regulations mentionedin Exhibitor’s Manual.
All
the materials used for stand building should have Fire certificates according to
the Russian legislation. You can also be obliged to cover your materials with special
fire-safety compound. This sort of services is provided by «TOLMS», LLC and will
be a subject to pay. Unfortunately, you can
contact them in Russian only:
Lukyanov
Mikhail
Cell
phone:. +7-964-782-76-30
Procedure of
execution and coordination of technical hanging.
In order to coordinate technical hangings it is
necessary to complete the form P-1 (see Annex No. 2 Exhibitor’s manual) for hanging the structure
with its brief description and to submit the stand and structure project.
Coordination of technical hangings is performed on a paid basis. The above
mentioned form and documents please send to Natalya Kuznetsova,
nk@aviasalon.com.
Р-1 Form (~ 34 kb)
Chalet air conditioning.
All split system installation works shall be
performed by TVC “Russia”, JSC
For the air conditioning in the chalets please
fill-in the necessary Form K «Chalet air conditioning» (~ 201 kb).
For the further information please contact Ekaterina
Gilevitch
Теl.: +7 (495) 556 – 53 – 11
|